CVALDO AWARDS

RCFCWCD LID Testing and Demonstration

Riverside County Flood Control District LID Testing and Demonstration Project – CValdo prepared PS&E for a testing facility designed to enable long-term research on the effectiveness and operations and maintenance requirements for stormwater Low Impact Development...

Crest Canyon Emergency Storm Drain Replacement

CValdo provided hydrology and hydraulics design services for emergency replacement of the Crest Canyon storm drain system. The old 54-inch diameter corrugated metal pipe storm drain system spanned approximately 4,000 feet through Crest Canyon Park, draining to the San...

43rd and Logan Stormwater Treatment

43rd and Logan Stormwater Treatment – CValdo prepared PS&E for design of 25 curbside stormwater filtration units, a trash capture pretreatment vault, and a biofiltration planter for this City of San Diego pilot project. The project goal was to reduce the discharge...

Chollas Creek Restoration

CValdo prepares PS&E for the restoration of a section of South Las Chollas Creek in the Encanto neighborhood of San Diego. The project included the replacement of a concrete-lined channel with a natural earthen watercourse, planting, and establishment of native...