CVALDO AWARDS

Crest Canyon Emergency Storm Drain Replacement – 2022

CValdo provided hydrology and hydraulics design services for emergency replacement of the Crest Canyon storm drain system. The old 54-inch diameter corrugated metal pipe storm drain system spanned approximately 4,000 feet through Crest Canyon Park, draining to the San...

RCFCWCD LID Testing and Demonstration – 2012

Riverside County Flood Control District LID Testing and Demonstration Project – CValdo prepared PS&E for a testing facility designed to enable long-term research on the effectiveness and operations and maintenance requirements for stormwater Low Impact Development...

43rd and Logan Stormwater Treatment – 2012

43rd and Logan Stormwater Treatment – CValdo prepared PS&E for design of 25 curbside stormwater filtration units, a trash capture pretreatment vault, and a biofiltration planter for this City of San Diego pilot project. The project goal was to reduce the discharge...

Chollas Creek Restoration – 2008

CValdo prepares PS&E for the restoration of a section of South Las Chollas Creek in the Encanto neighborhood of San Diego. The project included the replacement of a concrete-lined channel with a natural earthen watercourse, planting, and establishment of native...