CValdo is on the winning team to prepare final engineering for the replacement of the City’s existing potable water clearwell with two new 4.0 MG reservoirs. CValdo’s role is to analyze the existing drainage system which serves as the clearwell emergency overflow system, and recommend system improvements. CValdo will also provide water quality support for the site design aspects of the project.