Mar 20, 2023
Over the past several months CValdo was on winning teams selected for three City of San Diego on-call projects including: As-Needed Stormwater Capital Improvement Program Management and Engineering Design Services (Prime HDR), As-Needed Plan Check and Inspection...
Aug 8, 2022
CValdo provided hydrology and hydraulics design services for emergency replacement of the Crest Canyon storm drain system. The old 54-inch diameter corrugated metal pipe storm drain system spanned approximately 4,000 feet through Crest Canyon Park, draining to the San...
Aug 8, 2022
CValdo Corporation was selected to prepare an Industrial General Permit Storm Water Pollution Prevention Plan for Zucarmex USA, an Otay Mesa industrial facility that produces approximately 25 tons of refined sugar per day. Upon completion, the SWPPP was uploaded to...
Jul 1, 2022
CValdo was selected to provide on-call design, modeling, and plan check services to the Riverside County Flood Control and Water Conservation District. CValdo’s history working with the District includes a review of over 3,000 plan check submittals, design of the...
Jun 22, 2022
CValdo was selected to provide full-service on-call plan check services to the City of Escondido. This is the second plan check contract awarded to CValdo by the City. CValdo staff will be working in-house at the City as part of the plan check team.